Home Page

Basingstoke Skip Hire

Printer FriendlyTell a Friend

The project is to provide a biomass solution for Basingstoke Skip Hire to burn waste wood to produce saleable electric power up to 750kWe (gross) per hour at their existing waste recycling centre located in Armstrong Road, Basingstoke.

This project is based on the placement of one Uniconfort Global 500 series combustion unit operating at 8 BAR and delivering 10.5l/s at 140oC of super heated water. Included will be the boiler and necessary, complimentary equipment, six Organic Rankine Cycle (ORC) units, each delivering 125kWe (gross) and an adiabatic condensing unit.

CO2 Savings - Biomass V's Gas

Biomass = (Based on .680MW boiler) 139,400kg of CO2 per year.

Electric from natural gas = (Based on .680MW boiler) 3,034,214.4kg of CO2 per year.

 

TOTAL SAVING OF 2,894,814kg of CO2 per year (Approximate Figures)

 

Assumptions for this calculation are:

Energy generation @ .680MW

Calculated annual hours ORC – 8,200hrs

CO2 emission factor for Biomass – 0.025 kgCO2/KWh (obtained from the Carbon Trust Calculator 2010)

CO2 emission factor for electric from natural gas – 0.544 kgCO2/KWh (obtained from the Carbon Trust Calculator 2010)

For waste to energy solutions click here>>


ViArt - PHP Shopping Cart
wood chip boilers | wood pellet boilers | biomass boilers | commercial biomass boilers
ECO LINK RESOURCES LTD
The Old Filling Station
Great North Road
Great Ponton
Grantham
Lincolnshire, NG33 5AQ

Tel: 01476 530302, Mob:07800 601808
email: ken@eco-link.co.uk
Copyright 2009 @ www.eco-link.co.uk. All rights reserved.