The project is to provide a biomass solution for Basingstoke Skip Hire to burn waste wood to produce saleable electric power up to 750kWe (gross) per hour at their existing waste recycling centre located in Armstrong Road, Basingstoke.
Stable waste will be burned in the Biomass Boiler and converted to produce enough energy to supply the site with heating and sell excess energy back to the grid as electricity.
Drying wood and selling logs for burning in the domestic market is this company’s main business. They are located in Hereford. A Uniconfort thermal oil system of 1MW to provide oil at 200°C to heat 3 kilns located in parallel, was recently installed.
The project is to provide a biomass solution for Kingswood Leisure Centre to burn clean waste wood to produce saleable electric power up to 125kWe (Gross) per hour and 900KW of thermal energy to provide heating for heating (pool) and hot water.
Eco Link Ltd was commissioned to install a renewable energy and environmentally friendly solution at Manchester Airport’s new Visitor Centre to provide hot water, heating and water to the toilet block.
The owners of Greetham Valley hotel and Golf Club decided that it was the time to consider an alternative fuel heating system for their business. The rising cost of oil combined with their desire to install a ‘carbon neutral’ system were the main considerations in coming to this decision.
A farm in Cambridge with three farm houses was heated via one 30kw oil boiler and two 20kw oil boilers one for each property.All three oil boilers were removed, making way for one 50kw wood chip boiler located centrally between the three properties.
The owners of Lambley farm decided that it was the time to consider an alternative fuel heating system for the property. The rising cost of oil combined with their desire to install a ‘carbon neutral’ system was the main factors in this decision.